Bathroom renovation in London

Family bathrooms, en-suites and shower rooms, designed around how you use them and built by the same team. We plan the layout, source every material, build bespoke joinery and manage every trade through to handover.

Family bathroom with a floating walnut double vanity, twin vessel basins and a freestanding bath beneath the window
West Acton · Family bathroom, designed and built by WeTradeWorks
What’s included

Designed, sourced and built by one team

  • Layout design and 3D visuals
  • Tiles, sanitaryware and brassware sourced for you
  • Bespoke vanities and storage from our joinery team
  • Walk-in showers, wet rooms and freestanding baths
  • Underfloor heating, lighting and ventilation
  • Plumbing, electrics and drainage by qualified trades
  • Waterproofing, tiling and finishing
  • Snagging and a final walk-through
How it works

Five stages, one point of contact

  1. Stage 01

    Consultation

    We visit, take the brief and assess the property, its constraints and your budget.

  2. Stage 02

    Design

    Layouts, material selection and 3D visuals, refined with you until the design is signed off.

  3. Stage 03

    Quotation and programme

    An itemised quotation and a programme of works, so cost and timing are clear before anything starts.

  4. Stage 04

    Build

    Our team runs every trade, all procurement and the site itself, with one point of contact throughout.

  5. Stage 05

    Handover

    Snagging, final finishing and a walk-through together. We stay on hand for maintenance afterwards.

Timing

How long it takes

3–5 weeksTypical time on site

A straightforward refit sits at the shorter end. Moving the layout, adding underfloor heating or building a wet room takes longer. Tiles and sanitaryware often have lead times, so we order them before work starts.

Our work

Recent bathroom projects

Questions

Bathroom renovation: common questions

How long does a bathroom renovation take?

Most of our bathroom renovations take 3–5 weeks on site. Allow 4–8 weeks before that for design and ordering. We confirm the timing in your programme of works before anything starts.

Can I use my home while the bathroom is being renovated?

Usually, yes, as long as there’s another toilet in the house. The bathroom itself will be out of use for most of the project, and we’ll agree working hours and protected walkways with you before we start.

Do you supply the tiles and fittings?

Yes. We source tiles, sanitaryware, brassware and lighting as part of the design, or we can fit items you’ve chosen yourself. Either way, we check sizes and lead times before ordering.

Do I need planning permission?

Usually not. In England, refitting a kitchen or bathroom or changing an internal layout doesn’t normally need planning permission. Listed buildings need listed building consent for significant internal work, and in a leasehold flat you’ll usually need the freeholder’s consent. Building regulations still apply to structural changes, new electrical circuits, drainage and ventilation, and we’ll tell you at the design stage what your project needs.

How much will it cost?

Every home is different, so we don’t publish set prices. After a site visit we give you an itemised quotation showing the net cost, the VAT and the total, so you know the full price before anything starts.