Kitchen renovation in London
Kitchens planned around how you cook and live, then built by the team that designed them. We handle the layout, units, worktops, appliances, lighting and every trade, so you have one point of contact from first sketch to handover.

Designed, sourced and built by one team
- Layout design and 3D visuals
- Units, worktops, splashbacks and appliances sourced for you
- Bespoke shelving and joinery
- Open-plan layouts and wall removal, with structural input where needed
- Plumbing, electrics, gas and lighting by qualified trades
- Flooring, plastering and decoration
- Templating and fitting of worktops
- Snagging and a final walk-through
Five stages, one point of contact
- Stage 01
Consultation
We visit, take the brief and assess the property, its constraints and your budget.
- Stage 02
Design
Layouts, material selection and 3D visuals, refined with you until the design is signed off.
- Stage 03
Quotation and programme
An itemised quotation and a programme of works, so cost and timing are clear before anything starts.
- Stage 04
Build
Our team runs every trade, all procurement and the site itself, with one point of contact throughout.
- Stage 05
Handover
Snagging, final finishing and a walk-through together. We stay on hand for maintenance afterwards.
How long it takes
Units, worktops and appliances usually have lead times, and worktops are templated once the units are in, so there is a short pause before they’re fitted. Removing walls or moving services adds time.
Recent kitchen projects



Kitchen renovation: common questions
How long does a kitchen renovation take?
Most of our kitchen renovations take 6–8 weeks on site. Allow 4–8 weeks before that for design and for units, worktops and appliances to arrive. We confirm the timing in your programme of works before anything starts.
Can I live at home while the kitchen is being done?
Most clients do. We can help you set up a temporary kitchen in another room, and we’ll agree working hours, dust protection and access with you before we start.
Can you knock through to make an open-plan kitchen?
Yes. If the wall is load-bearing, a structural engineer specifies the support and the work is signed off under building regulations. We’ll explain what’s needed at the design stage.
Do I need planning permission?
Usually not. In England, refitting a kitchen or bathroom or changing an internal layout doesn’t normally need planning permission. Listed buildings need listed building consent for significant internal work, and in a leasehold flat you’ll usually need the freeholder’s consent. Building regulations still apply to structural changes, new electrical circuits, drainage and ventilation, and we’ll tell you at the design stage what your project needs.
How much will it cost?
Every home is different, so we don’t publish set prices. After a site visit we give you an itemised quotation showing the net cost, the VAT and the total, so you know the full price before anything starts.
