Kitchen renovation in London

Kitchens planned around how you cook and live, then built by the team that designed them. We handle the layout, units, worktops, appliances, lighting and every trade, so you have one point of contact from first sketch to handover.

Green shaker kitchen with a rattan dome pendant, ivory range cooker, Belfast sink and timber worktops
Church Terrace · Kitchen, designed and built by WeTradeWorks
What’s included

Designed, sourced and built by one team

  • Layout design and 3D visuals
  • Units, worktops, splashbacks and appliances sourced for you
  • Bespoke shelving and joinery
  • Open-plan layouts and wall removal, with structural input where needed
  • Plumbing, electrics, gas and lighting by qualified trades
  • Flooring, plastering and decoration
  • Templating and fitting of worktops
  • Snagging and a final walk-through
How it works

Five stages, one point of contact

  1. Stage 01

    Consultation

    We visit, take the brief and assess the property, its constraints and your budget.

  2. Stage 02

    Design

    Layouts, material selection and 3D visuals, refined with you until the design is signed off.

  3. Stage 03

    Quotation and programme

    An itemised quotation and a programme of works, so cost and timing are clear before anything starts.

  4. Stage 04

    Build

    Our team runs every trade, all procurement and the site itself, with one point of contact throughout.

  5. Stage 05

    Handover

    Snagging, final finishing and a walk-through together. We stay on hand for maintenance afterwards.

Timing

How long it takes

6–8 weeksTypical time on site

Units, worktops and appliances usually have lead times, and worktops are templated once the units are in, so there is a short pause before they’re fitted. Removing walls or moving services adds time.

Our work

Recent kitchen projects

Questions

Kitchen renovation: common questions

How long does a kitchen renovation take?

Most of our kitchen renovations take 6–8 weeks on site. Allow 4–8 weeks before that for design and for units, worktops and appliances to arrive. We confirm the timing in your programme of works before anything starts.

Can I live at home while the kitchen is being done?

Most clients do. We can help you set up a temporary kitchen in another room, and we’ll agree working hours, dust protection and access with you before we start.

Can you knock through to make an open-plan kitchen?

Yes. If the wall is load-bearing, a structural engineer specifies the support and the work is signed off under building regulations. We’ll explain what’s needed at the design stage.

Do I need planning permission?

Usually not. In England, refitting a kitchen or bathroom or changing an internal layout doesn’t normally need planning permission. Listed buildings need listed building consent for significant internal work, and in a leasehold flat you’ll usually need the freeholder’s consent. Building regulations still apply to structural changes, new electrical circuits, drainage and ventilation, and we’ll tell you at the design stage what your project needs.

How much will it cost?

Every home is different, so we don’t publish set prices. After a site visit we give you an itemised quotation showing the net cost, the VAT and the total, so you know the full price before anything starts.