Full home and flat renovation in London

Whole-home refurbishments for houses and flats, from reworking the layout to the last coat of paint. One team designs the space, procures everything and runs the build, so nothing gets lost between drawing and delivery.

Lounge with a marble Victorian fireplace, bespoke library units and a brass globe ceiling light
Church Terrace · Full apartment refurbishment
What’s included

Designed, sourced and built by one team

  • Layout redesign and space planning
  • Interior design, materials and 3D visuals
  • Kitchens, bathrooms and en-suites
  • Bespoke joinery: library units, wardrobes and storage
  • Rewiring, lighting design and heating
  • Flooring, plastering, mouldings and decoration
  • Procurement and full project management
  • Snagging and a final walk-through
How it works

Five stages, one point of contact

  1. Stage 01

    Consultation

    We visit, take the brief and assess the property, its constraints and your budget.

  2. Stage 02

    Design

    Layouts, material selection and 3D visuals, refined with you until the design is signed off.

  3. Stage 03

    Quotation and programme

    An itemised quotation and a programme of works, so cost and timing are clear before anything starts.

  4. Stage 04

    Build

    Our team runs every trade, all procurement and the site itself, with one point of contact throughout.

  5. Stage 05

    Handover

    Snagging, final finishing and a walk-through together. We stay on hand for maintenance afterwards.

Timing

How long it takes

3–6 monthsTypical time on site

Timing depends on the size of the home and how much changes. Structural work, extensions or listed-building consent add time. Your programme of works sets out each phase before anything starts.

Our work

Recent full home projects

Questions

Full home renovation: common questions

How long does a full renovation take?

Most full flat and house renovations take 3–6 months on site, depending on size and how much changes. Allow time before that for design, approvals and ordering. Your programme of works sets out every phase.

Can I live at home during a full renovation?

Most clients move out for the heaviest phases, such as strip-out, rewiring and new floors, because the home won’t have a working kitchen or bathroom for a time. On some projects we can phase the work so you can stay. We’ll talk this through at the consultation.

Do I need permission from my freeholder or neighbours?

In a leasehold flat, most leases need the freeholder’s consent (a licence for alterations) before layout or flooring changes. If work affects a shared wall, the Party Wall etc. Act 1996 may require notice to your neighbours. We’ll flag both at the design stage.

Do I need planning permission?

Usually not. In England, refitting a kitchen or bathroom or changing an internal layout doesn’t normally need planning permission. Listed buildings need listed building consent for significant internal work, and in a leasehold flat you’ll usually need the freeholder’s consent. Building regulations still apply to structural changes, new electrical circuits, drainage and ventilation, and we’ll tell you at the design stage what your project needs.

How much will it cost?

Every home is different, so we don’t publish set prices. After a site visit we give you an itemised quotation showing the net cost, the VAT and the total, so you know the full price before anything starts.

Planning a full home renovation? Tell us about your home.

Start a project →